Coca-Cola Changeover time cut from 3 hours to 1 on several high-speed can lines
Together with Coca-Cola, we delivered a faster and more reliable can line.
Back to cases
The challenge
On several can lines in the Netherlands, a format change took three hours on average. That meant recurring production losses and needless pressure on planning. The lines had to become more flexible without compromising on reliability or quality.
Our approach
De Machinedokters mechanically redesigned the existing machines so they could be changed over faster, without adding complexity.
We simplified critical set-up points and handled mechanical tolerances more cleverly, which cut the number of steps considerably.
The solution fits straight onto the existing installations: no new lines and no unnecessary electronics.
The result
- Changeover time reduced from 3 hours to 1 hour
- 2 hours of extra production time per changeover
- Consistently higher line availability
- Better use of existing production capacity
More output, less downtime.
Why companies call in De Machinedokters:
More output per hour
Less dependence on staff
Higher profit
Lower costs
Sound familiar?
Tell us what is happening in your factory and we will work out together where the gains are.